Interior under renovation with exposed framing and debris on the floor

Post-Construction

Post-construction cleaning in New York City

Rough, final and touch-up cleans for fit-outs, renovations and new buildings, from a team whose founder spent years supporting commercial construction operations.

Why us

We understand that the final clean is the last thing between you and handover

Before launching IreCore, our founder spent several years working alongside contractors on complex commercial projects.

That experience shapes how we approach a job site. We understand sequencing, punch lists, and why the cleaning crew being a day late can hold up a tenant move-in. We communicate like a trade on your schedule, not a vendor who needs chasing.

Then the hospitality training takes over, because a space can be broom-clean and still fail the owner's walkthrough. Construction dust settles on every horizontal surface for days, and the final clean is what makes a finished space look finished.

We carry general liability insurance with limits of $1 million per occurrence and $2 million general aggregate, and we can send a certificate for your project file.

Three phases

Rough, final and touch-up

You can book all three as a phased package or only the stage you need.

  1. Rough clean

    After the major trades finish: removal of leftover debris and packaging, bulk dust and dirt, and a first pass on floors, so finish work can proceed in a clean environment.

  2. Final clean

    The detailed clean: all surfaces dusted top to bottom, glass and mirrors, fixtures, cabinets inside and out, doors, frames and hardware, vents, baseboards and floors.

  3. Touch-up clean

    A last pass after punch list work and just before handover, to clear the dust and fingerprints that the final trades left behind.

Detail list

What construction leaves behind

Each of these items is a common reason a space fails an owner's walkthrough. They all go on our checklist.

  • Fine dust on ledges and trim
  • Paint and caulk overspray
  • Stickers and labels on glass
  • Adhesive and tape residue
  • Floor protection removal
  • Dust inside vents and returns
  • Light fixtures and switch plates
  • Inside drawers and cabinets
  • Door tops and frames
  • Grout haze on new tile
  • Plaster on outlets and hardware
  • Restroom fixtures and partitions
Newly finished building lobby with marble floors and a reception desk

Who we work with

Built for the people answerable for the handover

General contractors and construction managers

Give us the schedule and the site rules. We will sequence the clean around the remaining trades and raise problems early.

Property managers and owners

Between-tenant renovations and lobby upgrades, cleaned to a standard you would be happy to show a prospect.

Tenants and occupiers

New suite or relocation? We can clean the space before your furniture and people arrive, then transition into a recurring cleaning program.

Designers and architects

Your finishes deserve a careful final clean before the photographer shows up. Tell us the materials and we will treat them appropriately.

Questions

Post-construction FAQ

When should I schedule the final clean?
After the major trades and most of the punch list are done, but early enough to leave time for a touch-up before handover. Call us as soon as you have a target date, because the best time to plan is before the crunch.
What is the difference between a rough clean and a final clean?
A rough clean removes debris and bulk dust so finish work can continue. A final clean is the detailed, surface-by-surface clean that readies the space for its owner or occupants.
How do you price post-construction cleaning?
Pricing depends on the square footage, the condition of the space, the number of phases and how tight the deadline is. We walk the site first, so the price reflects the real job.
Do you clean new finishes safely?
Yes. Stone, wood, specialty glass and new metals can each react badly to the wrong product. Share your finish schedule or tell us about any sensitive materials, and we will choose accordingly.
Are you insured and safety trained?
We carry general liability insurance with limits of $1 million per occurrence and $2 million general aggregate. We are also working through 40-hour OSHA safety training. That training is not finished yet, so if your site requires specific safety cards, tell us and we will confirm what we can meet before work starts.
Do you haul away construction debris?
Our work covers cleaning-level debris such as packaging and leftover small items. Large-scale demolition or construction waste should stay with your carting arrangement. We will clarify this in the scope.

Have a handover date? Let's work back from it.

Send us the schedule, the square footage and where the project stands. We will walk the site and give you a phased plan and a clear proposal.